Preventing soil erosion using sheet piles
Pipe pulling process
Unroll the pipe
Reamer process
Reamer process
Pilot drilling process
Pilot drilling process
Duct bank construction
Riser construction
Riser construction
Riser construction, pouring concrete floor
Clear the area
Safety Talk before work
Manage workspace and traffic.
Project sign
Coring manhole
Pilot drilling process
Digging open the soil
Work preparation steps
Pipe pulling process
Digitrack Locating process
Swivel installation
Reamer process
Install the pipe into the pullbox.
Survey
Chong Kut Gate, The Grand Palace.
Horizontal Directional Drilling
Horizontal Directional Drilling
Clear the area
Pilot drilling process
Unroll the pipe
Pilot drilling process
Unroll the pipe
Unroll the pipe
The DigiTrak Falcon F5+ Locating system.
Complete
4
5
6
7
8
9
10
11
12
13
14
15
O
O
O
O
BROADBAND LEADER TECHNOLOGY CO.,LTD.
23/12 Moo 2 Nhamai Ladloomkaw Prathumthani 12160
Tel 02-101-4917
Visitor
© COPYRIGHT 2023 BROADBAND LEADER TECHNOLOGY CO., LTD ALL RIGHTS RESERVED.